What is the current status of the development?

The current status as of 22 April 2015 is as follows:

 

  • The first charging point went into service at 3 Köllnischen Park, 10179 Berlin.
  • Eight search areas with a total of 20 proposed locations have been found through the preliminary survey of "The Office for Charging Infrastructure And The Relevant Municipalities."
  • Preliminary enquiries have been made with the network providers about power connections for eleven search areas with a total of 24 locations.
  • Seven streetlight locations are currently being checked for their suitability as streetlight charging points.