Criteria for electric vehicle fleets in phase 2

The following criteria must be fulfilled in order to demonstrate demand:

Proof of purchase or a contract for use (e.g. a lease) of an electric vehicle.

The assurance of the buyer through the presentation of certain documents that the planned (further) operating life/ contract period of the electric vehicle is at least two years.

Up-to-date evidence of a place where there is a regular demand for charging, like, for example, a residence or a workplace, in whose surroundings a charging device should be installed.

The assurance of the users that is not foreseeable that the demand for charging will fall away, e.g. through a change of residence or workplace.

An AC 1-phase charging point (3,7 kW), located within a 200m radius of the desired location must be used at least once a day in the 3 months before the request is made.

An AC 3-phase charging point (11 kW), located within a 200m radius of the desired location, must be used at least twice a day in the 3 months before the request is made.

Have more questions? Submit a request

Comments